843-588-8481 info@29E6.co
Butler Marine Dry Stack

Butler Marine Dry Stack

Pre-engineered metal building for boat and trailer storage. The project required a heavy-duty slab design to support a boat load of...
Jeff’s Beverage

Jeff’s Beverage

Richmond Hill, GA (2017). Ainsworth Designs, Architect. Dewitt Tilton Group, Contractor. PEMB designed retail store with wood framing. New 8,000 sf retail facility, designed as a pre-engineered metal building (PEMB), with wood framed exterior walls and second floor....
Bluffton Centre

Bluffton Centre

Bluffton, SC (in progress). SM7, Architect. South Coast, Contractor. Multi-office medical facility serving growing demand in larger Bluffton region. In collaboration with the architect on the 29E6-Step Process, we provided an ideal structural system. Three buildings...
Herban Marketplace

Herban Marketplace

Beaufort, SC (2019). Allison-Ramsey, Architect. Renovation of an existing concrete masonry building with a new wood-framed porch. Located on Bay Street in Historic Beaufort, SC this is a popular restaurant for ‘treehuggers and granolas” (like myself) who enjoy organic...
Sub Station II

Sub Station II

Beaufort, SC (2019). SM7, Architects. Though a small project, the 29E6-Step Process provided the framework to meet structural goals and save costs. Wood frame project utilized structural design charrette enabling discussions between engineer and architect on shearwall...