Preciball

Project Description

Black Creek, GA (2016).
Dewitt Tilton Group, Contractor.

New (PEMB) pre-engineered manufacturing building.

New 40,000 sf facility for the distribution of large ball bearings, incorporating office suites and warehouse space. Provided foundation design for this pre-engineered metal building (PEMB) and wide, clear-span truss construction. In a high-wind region it’s critical the foundation design ensures the building is properly anchored to the foundation; anchor bolt and footing design need to account for substantial uplift from the frames bearing on the foundation, ensuring the slab is properly designed for the applicable forklift loading.