843-588-8481 info@29E6.co

TRU by Hilton

Project Description

Beaufort, SC  (2020).
SM7, Architect.
Alpha Construction, Contractor

Four-story wood-framed hotel with walls and roof of traditional light-framed, wood construction. Steel used to span large areas at ground level. Situated relatively close to possible seismic activity, the project had potential for a modest amount of liquefaction. Structural mitigation was utilized in order to alleviate this occurrence.