Jan 9, 2020
Black Creek, GA (2016). Dewitt Tilton Group, Contractor. New (PEMB) pre-engineered manufacturing building. New 40,000 sf facility for the distribution of large ball bearings, incorporating office suites and warehouse space. Provided foundation design for this...
Jan 9, 2020
Sheldon, SC (in progress). John Crouch, Architect. Neal’s Construction, Contractor. Two-phase project and expansion of existing fire station. Two-phase project and expansion of existing fire station. First phase involved new engine bay expansion, created using...
Jan 9, 2020
Burton, SC. Court Atkins, Architect. Fraser Construction. Two-story addition to existing fire station providing additional dormitory space. Two-story building addition to existing fire station provides additional dormitory space. The roof and floor framing is wood...
Jan 9, 2020
Beaufort, SC (2015) Cole Design Studio, Designer. Renovation of existing home with vast views from large over-sized windows requiring steel...
Jan 9, 2020
Fripp Island, SC (in progress). Frederick and Frederick Architects. David Tilton, Contractor. Wood-framed home with close proximity to ocean required foundation withstand high velocity wave action (also known as Velocity Zone) and potential for scour. As such, we...